Formal dedication of the arch took place at 6:30 pm on May 7, 2010.



The rebar for the pylons has been installed on both the north and south sides. Notice how the rebar is tucked under the drilled anchors. The closeup photo shows a copper grounding wire attached to one of the anchor points.
No comments:
Post a Comment